AI construction quote generator
A construction quote is the price you send a client for a defined job. It must name both parties, describe the work, list priced items, and state what is in and out of scope. Add payment terms and a validity date. You check the draft. It is not a contract.
A construction quote template you can read with JavaScript off
This is a draft pack, not a signed offer. Rates are blank. Fill your own numbers in the builder. You stay responsible for every figure.
| Kind | Item | Quantity | Rate |
|---|---|---|---|
| Labour | Strip out and protect the works | 3 | - |
| Labour | First and second fix carpentry | 8 | - |
| Materials | Structural timber package | 1 | - |
| Materials | Plasterboard and fixings | 1 | - |
Also state who you are, who the client is, what is out of scope, how you get paid, and how long the price stands.
The builder opens in your browser. The example draft above stays readable.
What every quote should include
If one of these is missing, the client can read the price as a hope, not an offer.
| Item | Why it matters |
|---|---|
| Your name and theirs | A price with no parties is not an offer anyone can accept. |
| The job in one paragraph | Scope creep starts when the work is only a total. |
| Priced items | Labour and materials split so the client can see the mix. |
| What is in | Stops the 'I thought that was included' call. |
| What is out | The quiet line that protects your margin. |
| Payment | Cash flow dies when this is left as a handshake. |
| A validity date | Material prices move. An open letter is a gift. |
Fixed price versus estimate
A fixed price is the number you will stand on if the scope does not change. You carry the risk if the job is heavier than you thought.
An estimate is a skilled view of cost. It can move when the drawing changes. Say which one you are sending. Clients treat silence as a fixed price.
How do I quote a building job without losing money?
Write the exclusions first. Then price the lines. Then set how long the letter stands.
A tidy total with no out-of-scope list is how extras vanish into a smile and a handshake.
When you want a person to price the drawing
This draft is the letter you send. The retained service still prices the job from the drawings when you want a person on it.
How the number behind a letter is produced
This draft is the letter. How quantities are measured and checked before you write one lives on the capability page.
Need a measured list for your own desk?
A client letter is for winning the job. A measured list is for checking the scope before you write that letter.
Need what to buy, not a letter to send?
A client letter wins the job. A buying list tells the yard what to load. Different file, different reader.
The rates on this letter are yours
Labour and material rates stay empty until you type them. We do not fill a UK market figure behind the scenes.
About this quote generator
Both names, a short job description, priced items, what is in, what is out, payment terms and a validity date. Skip one and the letter is easy to argue with.
List labour and materials. Add your margin. State what is not included. Set a date the price dies. Then read it once as the client would.
Send a fixed price only when the scope is tight. Send an estimate when the drawing may still move. Label it. Do not let the client guess.
That is where builders lose money. If an item is not written out, a client will treat it as included.
Long enough to decide, short enough that timber and labour have not moved. Put the date on the page. An open letter is a risk.
No. It makes a draft you must check. It is not reviewed. It does not form an agreement on its own.


Want a person to price the next job?
Tell us what a normal month looks like. We will size a band around that volume.