Estimating for property developers

A development decision dies on a late cost, not on a missing scaffold line. Estimating for property developers means a figure you can take to a land offer or a funder while the plan is still moving. We express it per square metre and per unit, then revise it as the scheme hardens.

Plastering a wall during an interior fit-out
Working through a drawing with a scale and a calculator

Appraisal-stage estimating

An appraisal figure is not a tender figure. It is early enough to change the offer you make on the land, or to stop the offer.

At this stage the drawings are thin. Massing, a mix of tenures, and a target floor area are often all you have. We price that, and we write the holes in plain English. A hole that is silent will come back as a surprise in the funder's pack.

A tender-stage estimate waits for a frozen pack and a contractor's method. If you ask for that depth on a red-line plan, you will wait for information that does not exist yet.

Say which decision the number has to support. A land offer and a full planning resubmission are not the same brief. We will not pretend they are.

An early pack is thin. Measurement still only reads what is on the sheet. It does not invent missing work to fill a board pack.

Cost per square metre and per unit

A line-item bill is how a contractor buys work. A development board reads cost per square metre of GIFA and cost per saleable unit. If those two numbers are missing, the bill will be re-totalled in a spreadsheet anyway.

We keep the measured file, then roll it to those two views. GIFA and unit count must come from you, or from the planner's schedule you send. We do not invent a net-to-gross.

Per-unit figures only help if the mix is stated. A one-bed and a four-bed are not one average. Split the mix before you ask for a single unit rate.

We do not publish a market £/m². Your rates, or the rates you ask us to hold, sit under the roll-up. A borrowed city average is someone else's scheme.

Laying facing bricks on a cavity wall
A team working through drawings together

Multi-unit and repeated typologies

Repeated house types look like a copy-paste. They are not. Plot levels, handed plans, and party walls change the measure even when the brochure plan is identical.

The published table treats a commercial or multi-unit scheme as extra large (two jobs). Extra floor area adds half a job per 150m². We do not invent a per-plot discount because the type repeats.

A terrace of six identical houses is still one multi-unit draw, not six times a new-build house line. The first type still gets a full check. Later plots are adjusted, not ignored.

If you only have one type and a plot count, send both. If the types diverge after planning, the next pass is a revision, not a free reprint.

Estimating across a scheme's stages

The same scheme should not be taken off from zero at every gate. Each pass should say what changed.

How the estimate is meant to move. We revise the last file. We do not start a blank sheet unless the scheme did.
StageWhat the number is forWhat we need from you
FeasibilityA land or option decision.Massing, mix, and a target GIFA.
PlanningA funder or committee pack.The planning set and the schedule of accommodation.
Pre-constructionA contractor conversation.The tender set, or the pack you will issue.
RevisionA change, not a new scheme.A list of what moved since the last file.

If you cannot say which stage you are in, we will ask before we count the jobs. A feasibility pass priced as a tender pass wastes both clocks.

A first figure you can put in a note

Some boards want a short written figure before the measured file is done. That is a different document from a tender bill.

The ungated draft letter is for that note. It is not an appraisal. You still check every number you type into it.

Questions a development manager asks

If the brief is an appraisal pass, yes, with the holes written down. A tender-depth file will not land on a red-line plan in that time.

Get a figure before the land offer

Send the drawings with the mix and the GIFA. Or see how jobs are counted on larger schemes.