Building materials estimating calculator
A bill of materials (BoM) is the buying list for one job: each product, how many, and the unit you order in. It is not a bill of quantities. That other file measures labour, plant and work sections so firms can compare prices. This page only works out what to buy.
A brick wall you can read with JavaScript off
Eight metres long, 2.4 metres high, no openings, one leaf. Coverage 60 bricks per square metre. Wastage left at zero. The result is an estimate, not an order.
| Product | How it was worked | Quantity | Unit |
|---|---|---|---|
| Facing bricks | 8 × 2.4 × 60 | 1,152 | nr |
| Ready-mixed lime:sand | 1,152 ÷ 1,000 × 1 tonne | 1.152 | tonne |
This table is in the page HTML. The builder below can repeat the same wall. It does not replace this table.
The builder opens in your browser. The example table above stays readable.
How to work out materials for a job
Four moves. Skip the last one and you buy short.
1
Read the latest drawing
Take lengths and areas from the revision you will build. An old cloud set will send the wrong order.
2
Apply the coverage figure
Multiply the net area or length by the coverage figure for that product. The figure sits on the form so you can change it.
3
Add your own wastage
Type the extra you expect for cuts and breakages. The box starts at zero. Do not copy someone else's percentage.
4
Round to the unit the yard sells
Bricks leave in packs, boards in sheets, concrete in full loads. Order the next full unit, not a part bag.
The unit you actually pay for
Coverage gives a raw number. The yard sells a different unit. That gap is where money walks.
| Product | Sold as |
|---|---|
| Facing brick | Pack. Pack count sits on the ticket and changes by works. |
| Concrete block | Pack or cube. Ask the yard; cube counts are not universal. |
| Plasterboard | Whole sheet. Standard UK sheet is 2400 × 1200 mm. |
| Ready-mixed concrete | Cubic metre, usually as a full load. |
| Softwood joist or stud | Stock length in metres. Buy the next length they hold. |
| Roof batten | Stock length in metres. |
| Bagged cement | 25 kg bag. |
| Building sand | Tonne or bulk bag. |
Pack counts change by plant. Read the ticket. Do not invent a pack size here.
Why do builders run short on bricks?
They take the wall area and forget the second leaf, or they leave wastage at zero on a cut-heavy gable.
They also order the raw brick count and ignore the pack. The last half pack still has to be paid for.
What happens if wastage stays at zero?
The list looks tidy and the site runs out on Thursday.
Cuts, breakage and bond waste are real. Type the extra you have seen on similar work, not a number copied from a blog.
Why does pack size matter more than the raw count?
A raw count of 1,152 bricks is not a ticket. The yard sells packs.
If you ignore the pack, you either wait for a second drop or you eat a half pack you did not plan to buy.
What if the drawing revision is stale?
A superseded cloud set still looks like a drawing. The openings have moved.
Take the sizes from the set the site will build, then run the list again.
A buying list is not a measured work file
This page stops at products, counts and the unit you buy. It does not price labour or split the job into work sections.
If you need that other file (the one firms use to compare a price), open the measured-list builder.
When you want the drawing taken off for you
The form here uses sizes you already have. The retained desk reads the plan and prices the whole job.
When the sizes still have to come from a drawing
This list uses sizes you already have. How we read those sizes from a sheet, and what degrades that pass, is a separate page.
When the sketch still needs a priced job
A buying list from sizes you already have is not a quote. Small firms still need a file they can send after a site visit.
Optional prices on this buying list
Coverage figures are not money rates. Optional product prices stay empty until you type them. This market has no sourced price file.
About this buying list
Yes. You pick a part of the job, type sizes, and get product lines. It is a buying list, not a priced job file.
No. Those belong on a measured work file. This page only names products, counts and units.
Each default shows its source on the form. You can edit every one. Empty boxes mean we would not stand behind a number.
Yes. The download stays on your machine. It is still an estimate. Check pack sizes before you send it.
No. They sit in this browser under one local key. Clear all wipes them. We never see the file.
Not until you check the drawing, the coverage and the pack size. The output is an estimate, not a ticket.


Want the plan taken off for you?
Send us a drawing. Or see what a retained band costs.