Skip to content

Material takeoff calculator

A material takeoff is the buying list for one job: each product, how many, and the unit you order in. It is not a quantity takeoff. That other file measures labor and divisions so firms can compare prices. This page only works out what to buy. US coverage rates are empty until you type them.

A brick wall you can read with JavaScript off

The table shows the method, not a US coverage rate. Type your own bricks per sq ft in the builder. We do not convert the UK figure.

Sample method only. Coverage is blank on purpose. Change it in the builder.
ProductHow it was workedQuantityUnit
Face bricklength × height × your count per sq ftyou type itea
Mortaryour yield × brick countyou type ityour unit

This table is in the page HTML. The builder below repeats the method. It does not invent a US rate.

The builder opens in your browser. The example table above stays readable.

How to work out materials for a job

Four moves. Skip the last one and you buy short.

  1. 1

    Read the latest drawing

    Take lengths and areas from the revision you will build. An old cloud set will send the wrong order.

  2. 2

    Type the coverage figure yourself

    US brick, CMU and gypsum sheet sizes are not UK sizes. This page does not convert a UK coefficient. You type the rate.

  3. 3

    Add your own waste

    Type the extra you expect for cuts and breakages. The box starts at zero. Do not copy someone else's percentage.

  4. 4

    Round to the unit the yard sells

    Brick leaves in cubes, board in sheets, concrete in full loads, lumber in nominal lengths. Order the next full unit.

The unit you actually pay for

Coverage gives a raw number. The yard sells a different unit. US pack sizes are not converted UK packs.

ProductSold as
Face brickCube or strap. Count sits on the ticket. We do not ship a pack size.
CMUCube. Ask the yard; cube counts are not universal.
Gypsum boardWhole sheet. Type the coverage of the sheet you buy.
Ready-mixed concreteCubic yards, usually as a full load.
Dimensional lumberNominal 2× size in linear feet. Not a metric section.
Roof battenStock length in feet.

Pack counts change by plant. Read the ticket. Do not invent a pack size here.

Why we leave US coverage boxes empty

UK brick and block sizes are not US modular brick or CMU. A converted coefficient is a wrong quantity, not a rounded one.

Until a sourced US rate is on file, you type the count your unit and joint actually give.

What happens if waste stays at zero?

The list looks tidy and the site runs out on Thursday.

Cuts, breakage and bond waste are real. Type the extra you have seen on similar work, not a number copied from a blog.

A buying list is not a quantity takeoff

This page stops at products, counts and the unit you buy. It does not price labor or split the job into divisions.

If you need that other file (the one firms use to compare a price), open the quantity takeoff.

When the sizes still have to come from a plan

This list uses sizes you already have. How those sizes are read from a sheet is a separate page.

Optional prices on this material list

Coverage figures are not dollar rates. Optional product prices stay empty until you type them. We do not ship a US price file.

About this material takeoff

Yes. You pick a part of the job, type sizes, and get product lines. It is a buying list, not a priced job file.

Sanding a plasterboard wall
Laying facing bricks on a cavity wall

Need the measured list as well?

Open the quantity takeoff for labor and divisions. Keep this page for what the yard loads.