Quantity takeoff template
A quantity takeoff is a measured list of the work on a job. Each line has a description, a unit and a quantity. You add your own rates to turn it into an estimate. It is not a bid and not a contract. General contractors use it to price the same scope, then roll it into a schedule of values.
A quantity takeoff you can read with JavaScript off
Quantities are sample measures only. Rates are blank. Type your own figures in the builder below. The result is an estimate, never a bid.
| Division | Description | Unit | Quantity | Rate |
|---|---|---|---|---|
| 01: Job setup and general conditions | Mobilize and temporary facilities | ls | 1 | - |
| 03: Footings, slabs and other cast work | Footing concrete | cu yd | 10 | - |
| 03: Footings, slabs and other cast work | Slab on grade | sq ft | 480 | - |
| 04: Brick, block and stone | Face brick veneer | sq ft | 520 | - |
| 06: Framing and other woodwork | Floor joists | lf | 260 | - |
| 09: Interior finishes | Gypsum board on walls | sq ft | 650 | - |
| 09: Interior finishes | Vinyl floor finish | sq ft | 300 | - |
| 32: Paving and outdoor work | Crushed stone at grade | ton | 8 | - |
This table is in the page HTML. The builder enhances it. It does not replace it.
The builder opens in your browser. The example table above stays readable.
How this takeoff is grouped
These groups follow a specification and procurement layout. They are not a UK work-section bill, and they are not a functional building-system breakdown.
| Group | What belongs here |
|---|---|
| 01: Job setup and general conditions | Mobilize, trailers, temp power and other job-wide setup. |
| 02: Site clearing and earthwork | Clearing, stripping and earth that serves the pad. |
| 03: Footings, slabs and other cast work | Footings, walls, slabs and other cast-in-place work. |
| 04: Brick, block and stone | Brick, block and stone. Coverage rates are yours. |
| 05: Steel and miscellaneous metal | Structural steel and miscellaneous metal. |
| 06: Framing and other woodwork | Framing, joists and other woodwork in linear feet. |
| 07: Weather barrier and roofing | Weather barrier, insulation and roofing. |
| 08: Doors, windows and other openings | Doors, windows and other openings. |
| 09: Interior finishes | Gypsum board, flooring and other interior finishes. |
| 22: Plumbing | Plumbing rough and finish. |
| 23: Heating and air | Heating, air and related equipment. |
| 26: Power and lighting | Power, lighting and low voltage you measure. |
| 31: Earthwork beyond the building | Earthwork beyond the building line. |
| 32: Paving and outdoor work | Paving, walks and other outdoor work. |
Licensing for official specification titles is an open legal check. These labels are ours.
How do I prepare a quantity takeoff?
Read the drawing once for the structure. Then walk each division and write a line for every measured item.
Put the unit next to the quantity before you think about money. Rates come last, and they are yours.
Quantity takeoff is not a schedule of values
A takeoff measures work. A schedule of values is how a general contractor bills that work across the job.
You can start from this list. You still have to group lines the way your pay app is written.
Why MasterFormat-style grouping is not UniFormat
A specification layout groups by work result, material and trade. That suits buyout and bid packages.
A functional layout groups by building system. That suits an early elemental estimate. This tool does not mix them.
Need a client-facing bid letter instead?
A takeoff is for your desk. A bid letter names the parties, the price and what is out of scope.
How a plan becomes a takeoff
This template starts after you already have quantities. How a sheet is measured, and who checks it, is a separate page.
Need a lumberyard list instead of a takeoff?
A takeoff prices labor and divisions so two firms can be compared. A material list only names products and counts.
Where the rates on this takeoff come from
This template starts with blank rates. Type figures you can defend. We do not ship a US rate library to load.
About this quantity takeoff template
Use sq ft, cu yd, ft, ea, ls or ton, or switch the tool to metric. Pick one unit per line.
No. A material list names products. A takeoff measures work. One line can include labor, equipment and material for that item.
Yes. The download stays on your machine. We never see the file. Open it in any spreadsheet.
General contractors, estimators and owners who already have measures. Homeowners rarely search this term.
No. Leave rates blank and fill them when you have them. The example does the same.
No. It helps you structure an estimate. A person still signs the number you give a client.


Need the buying list instead?
Open the material takeoff and type wall and floor sizes. Coverage rates on that page are yours.