Construction BoQ calculator

A Bill of Quantities (BoQ) is a measured list of the work in a job. Each line has a description, a unit and a quantity. You add your own rates to turn it into an estimate. It is not a quote or a tender. Contractors and surveyors use it to price the same scope.

A bill of quantities example you can read with JavaScript off

Quantities are sample measures only. Rates are blank. Type your own figures in the builder below. The result is an estimate, never a tender.

Sample measured lines for a small domestic job. No rates are supplied.
SectionDescriptionUnitQuantityRate
PreliminariesSite setup and welfareitem1-
GroundworksExcavate foundation trenchesm³12-
GroundworksConcrete in foundationsm³8-
SuperstructureFacing brickworkm²45-
SuperstructureSoftwood joistsm80-
FinishesPlasterboard to wallsm²60-
FinishesVinyl floor finishm²28-
ExternalRecycled hardcoretonne6-

This table is in the page HTML. The builder enhances it. It does not replace it.

The builder opens in your browser. The example table above stays readable.

How a BoQ is structured

These are the usual sections. Use them as a map, not as a rigid method.

SectionWhat belongs here
PreliminariesSite setup, welfare, plant that serves the whole job.
GroundworksDig, fill, drainage and concrete below the slab.
SuperstructureWalls, floors, roof and the carcass that stands up.
Internal finishesBoards, plaster, floors, doors and decoration.
ServicesFirst and second fix electrical and plumbing.
External worksPaths, drainage runs and anything outside the walls.
Provisional sumsWork you know will happen but cannot measure yet.

This is a reference table, not a step-by-step method.

How do I prepare a bill of quantities?

Read the drawing once for the structure. Then walk each section and write a line for every measured item.

Put the unit next to the quantity before you think about money. Rates come last, and they are yours.

What does a bill of quantities example usually miss?

People skip preliminaries and then wonder why the site cost disappeared.

They also mix units on one line. Keep m² and item on separate rows so the total can be checked.

Where a measured list ends and the service starts

This page prices what you already measured. The retained service measures the drawing and prices it for you.

How a drawing becomes a measured list

This tool starts after you already have quantities. The capability page is the drawing-to-list pass, with a person on the retained file.

When the tender return has to stand scrutiny

A line you typed tonight is not a compliant return. A bids desk needs the bill structured for packages and the invitation format.

Need a client-facing draft instead?

A measured list is for you and your surveyor. A client-facing draft is a different job.

Need a buying list instead of a measured work file?

A measured work file prices labour and sections so two firms can be compared. A buying list only names products and counts.

Where the rates on this list come from

This builder starts with blank rates. Type figures you can defend. This market has no sourced library to load.

About this construction BoQ calculator

Use m², m³, m, nr, item or tonne. Pick one unit per line. Mixed units on a single row make the total hard to check.

Checking a floor plan at a desk with a scale rule
Working through a drawing with a scale and a calculator