Estimating service for contractors
A main contractor loses a tender on a late or non-compliant return, not on a slow WhatsApp quote. This desk writes a structured Bill of Quantities (BoQ) you can submit, interrogate, and break into packages. The total is the last number you look at, not the first.


Tender submission requirements
A compliant return is a set, not a single cell. Most invitations ask for a priced bill, a form of tender, a programme note, and a list of exclusions that match the instruction.
Our output is the priced bill and the item list that sits under it. You still sign the form of tender. You still own the programme. We do not fill a PQQ for you.
Our BoQ uses clear work sections. If your client needs a set format, send it first so we can confirm what we can supply.
A return that arrives after the deadline is a non-return. Tell us the submission stamp when you send the pack. We will say if the clock fits before we count the jobs.
Addenda issued mid-tender change the bill. Forward each addendum the hour it lands. We do not chase the portal for you.
Subcontractor package breakdown
A single grand total cannot go to five specialists. Groundworks, frame, envelope, M&E and finishes each need their own slice, with the same item codes so the answers can be compared.
We keep the parent bill intact and cut package views from it. That is why section order matters more than a rounded lump. If the frame and the envelope share a line, nobody can price the interface.
Package lists also show where a provisional sum is hiding. A specialist will not bid a PS they did not see. Flag those before you issue the enquiry.
We do not run your specialist enquiry. We give you a bill you can issue without rewriting the descriptions by hand.


Working to a BoQ format
Our BoQ uses clear work sections. If your client needs a set format, send it first so we can confirm what we can supply. A client-issued unpriced bill is a different job: you are filling their rows, not writing your own.
If they issue the bill, send that file, not a redrawn take-off. We price against their item list. Where a row is silent on a method, we mark the assumption on that row.
If they issue drawings only, we write the bill in the method you name. Do not leave the method blank and expect two firms' bills to line up later.
A free measured-list builder exists if you already have quantities and want the rows in a sheet tonight. It is not a tender return. It does not apply your rates unless you type them.
How those measured lines are structured into a bill is a separate page.
Capacity for bid peaks
Tender dates cluster. Three invitations can land in the same fortnight, then the diary goes quiet. A band that only fits an average month will break in the cluster.
Unused jobs roll into the next month, up to three months. That rule exists for this pattern. A quiet January can fund a loud March if you do not let the oldest jobs lapse.
If a peak still overruns the band, you can buy extra jobs or move up a band. We charge the cheaper of those two. We do not invent a third option on the phone.
Tell us the known submission dates when you size the band. A diary with four stamps is a better brief than 'we are usually busy'.
A cluster of four stamps in ten days is the brief we size to. A vague 'busy in spring' note is not enough to pick a band.
Framework mini-competitions run on a shorter fuse. The parent agreement already fixed the rates; the return is quantities and a programme note. Send the call-off, not the whole framework, or we measure work that is already priced.
Questions a QS asks before they issue
If they issued an unpriced bill, we price those rows. If they issued drawings only, we write to the method you name. Say which case you are in.
Yes. The parent bill stays whole. Package views follow the same codes so the replies can be compared. You still send the enquiries.
Forward it the hour you see it. We will say if the remaining clock is enough. A silent addendum is a non-compliant return.
No. You sign that form. We supply the priced bill and the notes under it. The legal return stays yours.
They roll forward, up to three months. A gap in the diary can fund the next cluster. After three months the oldest unused jobs lapse.
Yes, if you name the method on each pack. Do not mix methods inside one bill unless the invitation says to.
Put a submission stamp in the diary
Send the drawings with the invitation dates. Or read the job rules on the price list.