Construction bid template
A construction bid is the price you send a client for a defined job. It must name both parties, describe the work, list priced items, and state what is in and out of scope. Add payment terms and a validity date. You check the draft. It is not a contract.
A bid letter you can read with JavaScript off
This is a draft pack, not a signed offer. Rates are blank. Fill your own numbers in the builder. You stay responsible for every figure.
| Kind | Item | Quantity | Rate |
|---|---|---|---|
| Labor | Protect the house and haul debris | 3 | - |
| Labor | Rough and finish carpentry | 8 | - |
| Materials | Framing lumber package | 1 | - |
| Materials | Gypsum board and fasteners | 1 | - |
Also state who you are, who the client is, what is out of scope, how you get paid, and how long the price stands.
The builder opens in your browser. The example draft above stays readable.
What every bid should include
If one of these is missing, the client can read the price as a hope, not an offer.
| Item | Why it matters |
|---|---|
| Your name and theirs | A price with no parties is not an offer anyone can accept. |
| The job in one paragraph | Scope creep starts when the work is only a total. |
| Priced items | Labor and materials split so the client can see the mix. |
| What is in | Stops the 'I thought that was included' call. |
| What is out | The quiet line that protects your margin. |
| Payment | Cash flow dies when this is left as a handshake. |
| A validity date | Material prices move. An open letter is a gift. |
Fixed price versus estimate
A fixed price is the number you will stand on if the scope does not change. You carry the risk if the job is heavier than you thought.
An estimate is a skilled view of cost. It can move when the drawing changes. Say which one you are sending. Clients treat silence as a fixed price.
How do I bid a building job without losing money?
Write the exclusions first. Then price the lines. Then set how long the letter stands.
A tidy total with no out-of-scope list is how extras vanish into a smile and a handshake.
Need a quantity takeoff for your own desk?
A bid letter is for winning the job. A takeoff is for checking the scope before you write that letter.
How the number behind a bid letter is produced
This draft is the letter. How quantities are measured from a plan sits on the capability page.
Need what to buy, not a letter to send?
A bid letter wins the job. A material takeoff tells the lumberyard what to load. Different file, different reader.
The rates on this bid letter are yours
Labor and material rates stay empty until you type them. We do not convert a UK figure and drop it into this draft.
About this construction bid template
Both names, a short job description, priced items, what is in, what is out, payment terms and a validity date. Skip one and the letter is easy to argue with.
List labor and materials. Add your margin. State what is not included. Set a date the price dies. Then read it once as the client would.
Send a fixed price only when the scope is tight. Send an estimate when the drawing may still move. Label it. Do not let the client guess.
That is where builders lose money. If an item is not written out, a client will treat it as included.
Long enough to decide, short enough that lumber and labor have not moved. Put the date on the page. An open letter is a risk.
No. It makes a draft you must check. It is not reviewed. It does not form an agreement on its own.


Need the takeoff before the letter?
Build the measured list first. Then copy the totals you trust into this bid draft.