Instant construction takeoff
An instant takeoff is a first pass from a drawing, in minutes. It lists the work the file can see. It does not invent a local cost index. You still add rates, waste and what the drawing left out.


What you should get from a first pass
You should get itemised lines, units and quantities. A single total with no lines is a guess, not a takeoff.
You should also get a way to export the list. If you cannot edit it, you cannot own it.
What an instant file leaves out
Site conditions, allowances and the things the drawing never showed. Those still need a person.
It also leaves out a genuine US cost base. Do not treat a converted foreign rate as a local number.
Three checks before you send the number
1
Match the revision
Take the set the site will build. A stale cloud file still looks finished.
2
Read the units
Sq ft and cu yd are not metres. Mixed units on one line make the total hard to check.
3
Name the holes
Write what the pass did not see. That list is the start of your exclusions.
About an instant construction takeoff
No. It is a first measured list. A bid names parties, exclusions, payment and a validity date.
No. We do not invent local cost data. You type rates you already trust.
Open the quantity takeoff template. The example table stays readable with JavaScript off.
Type the first pass yourself
The browser tool keeps every line on your machine. Add your rates when you have them.