Loft Extension with Rear Dormer and Bathroom Addition in E12 SAY
Project Title
Loft Extension with Rear Dormer and Bathroom Addition in E12 SAY
Overview
This project involves the construction of a loft extension at a property located in E12 SAY. The scope of work includes adding a rear dormer to the loft extension and constructing a bathroom within the new space. The project is in the initial stage of seeking quotes from contractors, with no existing plans in place.
Scope of Work
The project will include the following tasks:
1. Design and construction of the loft extension
2. Addition of a rear dormer for additional space and natural light
3. Structural analysis to ensure the safety and stability of the new addition
4. Interior finishing work to create a functional and aesthetically pleasing bathroom within the loft extension
Materials and Resources
Key materials and resources needed for this project:
1. Lumber and framing materials for the construction of the loft extension
2. Roofing materials for the rear dormer addition
3. Plumbing fixtures and fittings for the new bathroom
4. Electrical components for lighting and outlets in the new space
5. Interior finishing materials such as tiles, paint, and fixtures
Estimated Timeline
The expected duration for completion of this project will depend on the complexity of the design and the availability of contractors. However, a rough estimate would be around 3-6 months from the start of construction to final completion.
Project Category:
Extensions (rear, side, loft)
Project Tags:
loft extension, rear dormer, bathroom addition