Loft Extension with Bathroom and Rear Dormer Installation in E12 SAY Property

Project Title

Loft Extension with Bathroom and Rear Dormer Installation in E12 SAY Property

Overview

Our project involves constructing a loft extension with a bathroom and rear dormer installation at a residential property located in E12 SAY. The client does not currently have any existing plans for the extension, so our team will be responsible for the planning and design stage of the project. The aim is to create additional living space and enhance the overall functionality and value of the property.

Scope of Work

1. Conduct a site visit and survey to assess the feasibility of the loft extension and rear dormer installation.
2. Develop detailed plans and drawings for the loft extension, including the layout of the new bathroom and the design of the rear dormer.
3. Obtain any necessary permits and approvals from local authorities for the construction work.
4. Demolition of any existing structures in preparation for the new extension.
5. Construction of the loft extension, including the installation of the bathroom fixtures and fittings.
6. Installation of the rear dormer to allow for natural light and ventilation in the loft space.
7. Roof renovation to ensure the structural integrity of the new extension.
8. Final inspection and testing to ensure compliance with building regulations and client satisfaction.

Materials and Resources

Key materials needed for the project include:
– Timber for framing and structure
– Roofing materials such as tiles or shingles
– Bathroom fixtures and fittings
– Windows and doors for the rear dormer
– Insulation materials
– Plumbing and electrical supplies
– Tools and equipment for construction
Our team will also require access to skilled tradespeople such as builders, plumbers, electricians, and roofers to carry out the work effectively.

Estimated Timeline

The estimated timeline for completing the loft extension, bathroom installation, and rear dormer construction is approximately 3-4 months. This duration includes the planning and design stage, obtaining permits, construction work, and final inspections. However, the timeline may vary depending on factors such as weather conditions, material availability, and unforeseen setbacks.

Project Category: Extensions (rear, side, loft)

Project Tags: Loft Extension, Bathroom Installation, Rear Dormer Installation