Loft Extension with Bathroom and Rear Dormer in E12 SAY

Project Title

Loft Extension with Bathroom and Rear Dormer in E12 SAY

Overview

This project involves the construction of a loft extension with a bathroom and a rear dormer at a property located in E12 SAY. The client currently does not have plans in place, so the project will begin with the creation of customized design plans. The construction and building stage will include waterproofing, plumbing installation, and the addition of a rear dormer to enhance the space and natural light in the loft extension.

Scope of Work

1. Develop customized design plans for the loft extension
2. Implement waterproofing measures to ensure the longevity of the new structure
3. Install plumbing fixtures for the new bathroom
4. Construct a rear dormer to increase space and natural light in the loft extension

Materials and Resources

1. Timber for the frame and structure
2. Insulation materials for energy efficiency
3. Bathroom fixtures including sink, toilet, and shower
4. Roofing materials for the rear dormer
5. Waterproofing membranes and sealants
6. Plumbing supplies and fittings

Estimated Timeline

The estimated timeline for this project is approximately 6-8 weeks, depending on the complexity of the design and the availability of materials and resources.

  • Extensions (rear, side, loft)
  • Bathroom remodels
  • Plumbing installation

Project Tags

Loft Extension, Bathroom Renovation, Rear Dormer