Loft Extension and Rear Dormer with Bathroom Addition in E12 SAY Property
Project Title
Loft Extension and Rear Dormer with Bathroom Addition in E12 SAY Property
Overview
Our project aims to expand and enhance a property located in E12 SAY through the construction of a loft extension with a rear dormer and the addition of a bathroom. The project will involve the entire process from initial planning and design to obtaining permits and approvals for the construction. The property currently does not have any existing plans for the proposed extension and remodel.
Scope of Work
1. Conduct initial site assessment and feasibility study
2. Design the loft extension and rear dormer with bathroom addition
3. Obtain necessary permits and approvals from local authorities
4. Demolish any existing structures as needed
5. Construct the new loft extension and rear dormer
6. Install plumbing and electrical systems for the new bathroom
7. Complete all finishing work and ensure compliance with building regulations
Materials and Resources
Key materials needed for the project include:
– Timber for structural framing
– Roofing materials for the dormer
– Insulation for energy efficiency
– Plumbing fixtures for the bathroom
– Electrical wiring and fixtures
– Interior finishing materials such as drywall, paint, and flooring
Estimated Timeline
The estimated timeline for the completion of this project, including planning, design, and construction stages, is approximately 6-8 months. This timeline may vary depending on factors such as weather conditions, availability of materials, and any unforeseen challenges encountered during the construction process.
Project Category
Extensions (rear, side, loft)
Project Tags
Loft Extension, Bathroom Addition, Dormer Construction